Jump to content
Bottled Ship Builder

Leaderboard

Popular Content

Showing content with the highest reputation on 04/16/2020 in all areas

  1. Donald

    Mayflower

    I believe we are thinking along the same line here. Thanks for the input.
    1 point
  2. DavidB773

    Mayflower

    I’m a firm believer in pegging parts because it’s useful for positioning and for added strength. Now how about this, a control line through the hull will bring the channel board (with ratlines secured) to the hull and hold it there. Then your positioning tool can be used to guide the part home. A single control line should handle it. I think that a longer peg, even made of wire, would allow for easier placement because it would create more slack with the ratlines.
    1 point
×
×
  • Create New...